Saturday, February 05, 2011

E-2D Carrier Suitability Trials...


The E-2D Advanced Hawkeye approaches USS Harry S. Truman (CVN 75) during Carrier Suitability Testing today. Aircraft 501 is assigned to Air Test and Evaluation Squadron (VX) 20 and is the first of 75 E-2D Advanced Hawkeye aircraft to be acquired by the U.S. Navy. The program remains on track for Initial Operational Capability scheduled for first quarter fiscal year 2015. (Photo courtesy of Northrop Grumman)
The latest aircraft variant of the E-2 platform, the E-2D Advanced Hawkeye, lands aboard the aircraft carrier USS Harry S. Truman (CVN 75) during Carrier Suitability Testing today. The aircraft, assigned to Air Test and Evaluation Squadron 20 (VX-20), remains on track for Initial Operational Test and Evaluation scheduled for first quarter fiscal year 2012. (Photo courtesy of Northrop Grumman)
The E-2D Advanced Hawkeye assigned to Air Test and Evaluation Squadron 20 (VX-20) catches the arresting wire aboard the aircraft carrier USS Harry S. Truman (CVN 75) during carrier qualifications testing. The E-2D Advanced Hawkeye’s command and control capability makes it a multi-mission platform through its ability to coordinate concurrent missions that may arise during a single flight. (Photo courtesy of Northrop Grumman)

No comments :

Post a Comment

Note: Only a member of this blog may post a comment.