NAVAL AIR SYSTEMS COMMAND PATUXENT RIVER, Md. – The Navy has received
its first P-8A production representative operational test aircraft June
24.
The new P-8A arrived at NAS Patuxent River and it will join three
developmental test aircraft already undergoing integrated testing in
preparation for initial operational test and evaluation of the P-8A
Poseidon.
The Navy entered into Low Rate Initial Production of the first six
Poseidon aircraft in January 2011. These aircraft will be used to form
the first operational P-8A squadron, which is scheduled for initial
operational capability in 2013. |